MCAC makes case for work comp rate flexibility on veneer work

Words: Julie TrostIn March, MCAC presented its case to allow mason contractors to use the Tile Setter class code when performing adhered veneer work to the Workers Compensation Insurance Rating Bureau (WCIRB - the independent organization that sets Workers Comp rates and defines class codes). Going into the discussion, WCIRB was considering such an allowance IF the mason was not doing any other work on a project. Our position was that veneer work performed by either a tile or mason contractor should be allowed under the Tile Setter class code because the...
  1. Class code should correspond to the work NOT the trade.
  2. Tile Setter class code rate is 93% less than the Masonry dass code 5027 rate for employees under the $27/hour threshold which creates a notable imbalance for competitive bidding.
The WCIRB preliminary panel agreed. To date, the classification change has cleared its first committee hearing and has one more committee and the Insurance Commissioner to go.

Changes approved by the Insurance Commissioner will take effect January 1, 2016. At that point, mason contractors would need to determine the appropriate class code for their projects and the record-keeping requirements associated with utilizing both the Masonry and Tile Setter class codes on a single project. Click here for the minutes of the Classification and Rating Committee hearing on the issue (pgs. 35-44).
About: Featured
What gives with head protection? Why workers want to keep their hard hats and ditch safety helmets.
April 2025

Last August, I took my pickup to the dealership for a nagging check engine light. While it was being looked over, I chatted with the salesman I normally deal with, and he told me about the latest and greatest 2025 models. He told me how the twin turbo inl

Government Affairs: Bringing North Carolina to Washington, D.C. and Hopefully Young People to Your Jobsites
April 2025

For you long time members of the Mason Contractors Association of America you likely remember our Annual Washington, D.C. Fly-In where MCAA members from around the country would come to Washington, D.C. meeting with Members of Congress from their home sta

Chairman's Message: While We Are Still Here
April 2025

I truly value my days working on construction sites during the summers of my high school and college days. Some moments in our youth are so clearly meaningful that we file them away in our subconscious to be recalled when life events require inspiration.

Contractor Tip of the Month: The Tough Calls That Define a Leader
April 2025

In construction, every project balances a delicate trio: coordination, precision, and timing. However, beyond blueprints and schedules, leadership demands something far greater—the ability to lead and make difficult decisions that shape the future of a co