Painter's Corner: MCAA Magazine

Words: Jerry Painter

MCAA Magazine

Jerry Painter

I’m sure everyone remembers the adage “measure twice and cut once”.  Its purpose was to stress the importance of correct measurements.  The Inca’s, the Mayan’s, and the Egyptian’s must have thought precise measurements were very important.  The builders of the great cathedrals also knew that all measurements had to be accurate.  The beauty and longevity of these structures prove how important precise measurements truly are.  We have progressed tremendously from the most rudimentary devises.  We have come from using body parts in repetition, to standardization, such as cubit, rod, and square.  In my lifetime, we have progressed from the use of water levels, plumb bobs, and steel tapes, to the use of transits, building levels, retractable single-user measuring tapes, and on to lasers and GPS.  Yet, we still can’t seem to get it right. All of our materials have built in tolerances.  Our measurements also have some allowable variations.  As an example, masonry is considered ‘PLUMB’ if it is within ¼” in 10’-0”.  The wood industry is so detached, they prefer not to deal with tolerances.  Locally I know of wood framed buildings that are as much as four stories high, and 2” to 6” out of plumb.  As for light gauge steel and structural heavy steel, many installers believe everything is fine as long as the structure stands when bolted together and doesn’t fall over.  Do not let the iron workers install shelf angles.  They just don’t understand level and plumb as necessary for a masonry installation. Masonry contractors with our unyielding tolerances, some as small as 1/16”, have to work around, within, and over some of these framing systems.  The concrete folks have larger tolerances than masonry, even when the masonry and concrete beams, columns and slabs are tied into the same wall.  The slab edges frequently wander, the footings are wavy, the columns are twisted, and the beams wobble around.  However, the masons are expected to bring it all together as a finished wall.  A CMU corridor wall with wall washing light is expected to have no shadows.  Drywall can’t do that and it comes in sheets, not hand placed individual units. We give plumbers and electricians a 5 ¼”X 5 ¼” core opening in the CMU’s to get their PVC and conduit in, and yet they cannot seem to get it into an 8” wall. They wonder why we get mad when we have to thin down the face shell of the CMU. DUH! Come on back next month and we will discuss who has the responsibility to get it right the first time. Until then, measure twice and verify, verify, verify. Raise the line and come on around the corner!  
The Cornerstone of Success: Safety and Documentation in Masonry
April 2025

The masonry industry plays a vital role in constructing our homes, businesses, and infrastructure. Yet, beneath the enduring beauty of brick and stone lies a complex and often hazardous work environment. Ensuring the safety of workers and maintaining docu

How It's Made: Natural Stone Veneer
April 2025

Natural stone veneer is a durable, versatile, and aesthetically pleasing building material that has been used for centuries. It adds timeless beauty to masonry projects while offering structural integrity and resilience. But how does natural stone veneer

Vibing Masonry #5 - The Evolution of Concrete Masonry Units: From Ancient Foundations to Modern Innovations
April 2025

Early Development: The Genesis of Concrete Blocks (early Rome to 1900s) The history of concrete masonry units (CMUs) or concrete blocks begins with humanity’s earliest binding materials, notably the Romans’ remarkable concrete. Around AD 125, structures l

MASONRY STRONG Podcast, Episode 18 Recap: Jeff Tew, Westlake Royal Stone Solutions
April 2025

On this episode of the MASONRY STRONG Podcast, Jeff Tew joins the show, along with MCAA President Jeff Buczkiewicz, to talk about where his passion for this industry started and what it's been like working on the Supplier side of the industry. An Excitin