Howard Sellick


Roles


First Off
April 2003

The Piggy Back forklift is arguably the first responder to material movement on the job site.

Masonry Magazine April 2003 Page. 22
April 2003

Forklift
EQUIPMENT

The operator can pick-up and place mortar from the mixing area to the work site area where masonry is being installed.

Bristow gives a "shopping list" of operations the telehandler can perform for the contractor.

Masonry Magazine June 1994 Page. 50
June 1994

DUR-O-WAL

DUR-O-WAL products. The fast, easy, economical way to retrofit existing masonry walls.

DUR-O-WAL restoration products stabilize facade walls and panels quickly, effectively and afford-ably. Three easy-to-install products solv

Masonry Magazine August 1993 Page. 22
August 1993

CAST AND SIMULATED STONE

TECHCRETE ARCHITECTURAL PRECAST
12920 Alex Andria Dr., Opa Locka, FL, 33054. Phone: 305/688-1461. Fax 305/688-3107. Tom Van Bree, President, Gary Bozyard, Plant Manager. Manufacturers of simulated coral stone cast,

Masonry Magazine February 1985 Page. 25
February 1985

N

NATIONAL WIRE PRODUCTS CORPORATION
8203 Fischer Rd., Baltimore, MD 21222

Represented by: Sterling E. Hetrick, Jerry Seling, Don Lopez

Featuring: Masonry wire reinforcement products, accessories, control joint and Pos-I-T